Madison County residential building permits

Housing units, buildings and construction value authorized by building permits in Madison County and each of its 3 permit issuing places, from the US Census Bureau Building Permits Survey. The county is the sum of its places. Consumer spending in Madison County.

Places in Madison County, latest figures

Sort any column; select a place to open its card. A county permit office issues permits for the unincorporated area, or for the whole county where no city issues its own.

AreaTypeLatest monthUnits, last 12 monthsChangeOne unitFive or moreValue, last 12 monthsAnnual tableUnits that year
Madison CountyCounty permit officeAug 202642+5.0%400$20,267,523202539
Lee townMunicipalityDec 20042-50.0%20$196,90020160
MadisonMunicipalityDec 20140n/a00$020200

County and places

Madison CountyCounty total12 months to Aug 2026: 42 units, +5.0%

Latest figures
MeasureFigure
Units, latest month (Aug 2026)4
Units, 12 months to Aug 202642
Change on the 12 months before+5.0%
Of which one unit buildings40
Of which buildings of five or more units0
Construction value, the same 12 months$20,267,523
Change in value+71.6%
Units, annual table, 202539
Change on 2024+30.0%
Annual table, as published by the Bureau
YearUnitsOne unitFive or moreValueUnits, reported only
202539390$12,007,85139
202430280$7,381,67530
202331310$8,167,61031
202252520$13,138,32052
202152520$10,618,1400
202043430$8,780,3850
201939390$7,963,6050
201837370$7,466,0201
201733330$6,738,4350
201630300$6,125,85030
201535350$4,390,1411
201433330$4,115,4310

The chart and the download carry every year from 1980; the twelve latest are listed here.

Estimates with imputation lead; reported only counts what permit offices actually reported. The annual view of the chart draws this table.

US Census Bureau Building Permits Survey, Madison County. Monthly: monthly figures as first published, before late reports and corrections (Jan 1988 to Dec 2012); the Bureau's final revised monthly records (Jan 2013 to Dec 2025); the current year's months, revised through the latest release (Jan 2026 to Aug 2026), Jan 1988 to Aug 2026, 383 months. Annual table 1980 to 2025. County figures are the sum of the county's permit issuing places.

Madison CountyCounty permit office12 months to Aug 2026: 42 units, +5.0%

Latest figures
MeasureFigure
Units, latest month (Aug 2026)4
Units, 12 months to Aug 202642
Change on the 12 months before+5.0%
Of which one unit buildings40
Of which buildings of five or more units0
Construction value, the same 12 months$20,267,523
Change in value+71.6%
Units, annual table, 202539
Change on 2024+30.0%
Annual table, as published by the Bureau
YearUnitsOne unitFive or moreValueUnits, reported onlyMonths reported
202539390$12,007,8513912
202430280$7,381,6753012
202331310$8,167,6103112
202252520$13,138,3205212
202152520$10,618,14000
202043430$8,780,38500
201939390$7,963,60500
201836360$7,351,02000
201733330$6,738,43500
201630300$6,125,8503012
201534340$4,240,14100
201433330$4,115,43100

The chart and the download carry every year from 1980; the twelve latest are listed here.

Estimates with imputation lead; reported only counts what permit offices actually reported. The annual view of the chart draws this table.

Years whose months do not add up to the annual table
  • 2013: months add to no months, annual table 34 units. Annual table only: no monthly record for this place and year.
  • 2014: months add to no months, annual table 33 units. Annual table only: no monthly record for this place and year.
  • 2015: months add to no months, annual table 34 units. Annual table only: no monthly record for this place and year.
  • 2016: months add to no months, annual table 30 units. Annual table only: the place is surveyed annually, or its monthly records were not published.
  • 2017: months add to no months, annual table 33 units. Annual table only: no monthly record for this place and year.
  • 2018: months add to no months, annual table 36 units. Annual table only: no monthly record for this place and year.
  • 2019: months add to no months, annual table 39 units. Annual table only: no monthly record for this place and year.
  • 2020: months add to no months, annual table 43 units. Annual table only: no monthly record for this place and year.
  • 2021: months add to 0, annual table 52 units. Only 3 of 12 months have a revised record.

US Census Bureau Building Permits Survey, Madison County (named MADISON COUNTY (1980 to 1988); Madison County Unincorporated Area (1991 to 2018); Madison County (1987 to 2026) in the Bureau's files). Monthly: monthly figures as first published, before late reports and corrections (Jan 1988 to Dec 2004); the Bureau's final revised monthly records (Oct 2021 to Dec 2025); the current year's months, revised through the latest release (Jan 2026 to Aug 2026), Jan 1988 to Aug 2026, 263 months. Annual table 1980 to 2025.

Lee townMunicipality12 months to Dec 2004: 2 units, -50.0%

Latest figures
MeasureFigure
Units, latest month (Dec 2004)0
Units, 12 months to Dec 20042
Change on the 12 months before-50.0%
Of which one unit buildings2
Of which buildings of five or more units0
Construction value, the same 12 months$196,900
Change in value-42.1%
Units, annual table, 20160
Change on 2015n/a
Annual table, as published by the Bureau
YearUnitsOne unitFive or moreValueUnits, reported onlyMonths reported
2016000$000
2015000$0012
2014000$0012
2013000$0012
2012000$0012
2011000$0012
2010000$0012
2009110$49,020112
2008000$0012
2007220$303,475212
2006110$85,000112
2005330$319,400312

The chart and the download carry every year from 2003; the twelve latest are listed here.

Estimates with imputation lead; reported only counts what permit offices actually reported. The annual view of the chart draws this table.

Years whose months do not add up to the annual table
  • 2013: months add to no months, annual table 0 units. Annual table only: the place is surveyed annually, or its monthly records were not published.
  • 2014: months add to no months, annual table 0 units. Annual table only: the place is surveyed annually, or its monthly records were not published.
  • 2015: months add to no months, annual table 0 units. Annual table only: the place is surveyed annually, or its monthly records were not published.
  • 2016: months add to no months, annual table 0 units. Annual table only: no monthly record for this place and year.

US Census Bureau Building Permits Survey, Lee town. Monthly: monthly figures as first published, before late reports and corrections, Jan 2003 to Dec 2004, 24 months. Annual table 2003 to 2016.

MadisonMunicipality12 months to Dec 2014: 0 units, n/a

Latest figures
MeasureFigure
Units, latest month (Dec 2014)0
Units, 12 months to Dec 20140
Change on the 12 months beforen/a
Of which one unit buildings0
Of which buildings of five or more units0
Construction value, the same 12 months$0
Change in valuen/a
Units, annual table, 20200
Change on 2019n/a
Annual table, as published by the Bureau
YearUnitsOne unitFive or moreValueUnits, reported onlyMonths reported
2020000$000
2019000$000
2018110$115,000112
2017000$0012
2016000$0012
2015110$150,000112
2014000$0011
2013000$0012
2012000$0012
2011000$002
2010000$009
2009000$0012

The chart and the download carry every year from 1991; the twelve latest are listed here.

Estimates with imputation lead; reported only counts what permit offices actually reported. The annual view of the chart draws this table.

Years whose months do not add up to the annual table
  • 2015: months add to no months, annual table 1 units. Annual table only: the place is surveyed annually, or its monthly records were not published.
  • 2016: months add to no months, annual table 0 units. Annual table only: the place is surveyed annually, or its monthly records were not published.
  • 2017: months add to no months, annual table 0 units. Annual table only: the place is surveyed annually, or its monthly records were not published.
  • 2018: months add to no months, annual table 1 units. Annual table only: the place is surveyed annually, or its monthly records were not published.
  • 2019: months add to no months, annual table 0 units. Annual table only: no monthly record for this place and year.
  • 2020: months add to no months, annual table 0 units. Annual table only: no monthly record for this place and year.

US Census Bureau Building Permits Survey, Madison. Monthly: monthly figures as first published, before late reports and corrections (Feb 1991 to Dec 2012); the Bureau's final revised monthly records (Jan 2013 to Dec 2014), Feb 1991 to Dec 2014, 287 months. Annual table 1991 to 2020.

Sources on this page

Download the data

Place monthly CSV (gzip) Place annual table CSV County monthly CSV County annual CSV Place registry CSV Annual differences CSV

One row per place and month with buildings, units and value by structure size, the basis of the figure and the Bureau's source code; the annual table with estimates and reported only columns; the same for counties; the place registry with every name the Bureau's files have used; and every place year whose months do not add up to the annual table, with the reason.